How can I repair the spalling and forklift damage to my concrete warehouse floor at the loading dock before coating?

The answer comes from one of our Caribbean contractors.

Prep the floor for coating which will remove all loose material.

Prime the floor with NovaTuff P-505 Epoxy Primer.

Using a trowel, smoothly repair damaged area with NovaTuff PC-460 loaded with silica to mortar consistency. This material will harden in a few hours.

Apply 2 coats NovaTuff FC-200 over entire floor.

Call Now
Notice: Undefined index: share_counts in /home/mjw6900/public_html/novatuff/wp-content/plugins/simple-social-buttons/simple-social-buttons.php on line 477

Warning: Illegal string offset 'share_counts' in /home/mjw6900/public_html/novatuff/wp-content/plugins/simple-social-buttons/simple-social-buttons.php on line 477

Notice: Uninitialized string offset: 0 in /home/mjw6900/public_html/novatuff/wp-content/plugins/simple-social-buttons/simple-social-buttons.php on line 477