NovaTuff reaches its full cure after 7 days at 80 degrees F. It can typically be walked on after 24 hours and filled with water at 3 days. Pool chemicals should not be introduced until coating is fully cured.
You may also like
Non-skid additive is recommended in areas where significant water will be present. In many instances it is not necessary.
Spraying is an excellent method for applying the NovaTuff RC-100 flexible epoxy roof coating system. Spray application requires a commercial spray rig with […]
Cracks larger than 1/8 inch should be routed out and filled with caulk. Smaller static cracks can be coated.
Proper preparation is the most important part of any coating project. NovaTuff provides a detailed concrete preparation guide, which is available on […]