NovaTuff reaches its full cure after 7 days at 80 degrees F. It can typically be walked on after 24 hours and filled with water at 3 days. Pool chemicals should not be introduced until coating is fully cured.
You may also like
NovaTuff is designed to withstand periodic ponding water. When ponding water is significant and can affect the building integrity, measures should be […]
Non-skid additive is recommended in areas where significant water will be present. In many instances it is not necessary.
Once installed, NovaTuff can handle temperature extremes, from below freezing to high desert temperatures. It should be installed when temperatures are above […]
Yes, use 2 coats of NovaTuff P-505 Epoxy Primer at 1 gallon per 150 to 200 square feet. Concrete must be more […]